Construction Project Scheduler-2602260GH01

Chicago, IL
Full Time
Transit and Rail
Experienced
About Us
Ardmore Roderick is a full-service infrastructure solutions firm that specializes in Utilities, Transportation, Aviation, Rail and Transit, Building and Facilities Projects. We are headquartered in Chicago, IL with offices in Florida, Illinois, North Carolina, Ohio, Pennsylvania, Tennessee, and Texas.
 
Our Vision
Reimaging infrastructure to improve lives and communities

Our Mission
Transforming communities by empowering the best minds to deliver innovative infrastructure solutions.
 
Our Values
  • Caring
  • Excellence
  • Impact
  • Innovation
  • Inclusion
  • Safety
Job Overview
We are seeking a new Construction Project Scheduler to join our team at Ardmore Roderick. As a Construction Project Scheduler, you will join a team of infrastructure solutions experts working to solve our client’s ever-evolving project needs. This opportunity will be in the client’s South Chicago field office and could have potential to be hybrid depending on the specific client, project, and team needs.
 
Key Responsibilities
  • Responsible for the technical work including Primavera P6 scheduling, project management information systems (Microsoft SharePoint and Trimble Unity Connect) and the Microsoft Suite
  • Support the technical aspects of project development and delivery and will perform quality control/quality assurance on elements of project controls work efforts, products and deliverables
  • Consult on complex project schedule issues
  • Apply advanced knowledge to make recommendations and deliver solutions
  • Attend meetings with contractors and stakeholders to discuss project status and participate in field inspections if necessary
Required Qualifications
  • Four-year degree in Construction Management, Engineering or equivalent field of study
  • Five (5) to seven (7) years of experience utilizing Oracle Primavera P6 version 20.12 or higher
  • Three (3) to five (5) years of heavy civil scheduling projects
  • Ability to clearly communicate the status of a CPM schedule
  • Ability to merge or summarize schedules into a master schedule
  • Proficiency in Microsoft Office
  • Have a collaborator mindset with the ability to communicate proficiently in written and verbal forms
  • Have great organizational skills
  • High diligence in analyzing schedule data
Preferred Qualifications
  • PMP certification and/or PMI-SP certification or willingness to pursue same
  • Public transit and rail industry experience that provides subject matter expertise in this technical specialty
  • Three (3) to five (5) years of rail and transit experience
  • Two (2) years of estimating in rail and transit
  • Ability to create, manage and analyze project timelines
  • Ability to initiate time impact analysis and or delay claims
  • Ability to cost and or resource load a construction schedule
  • Ability to manage large complex projects
  • Ability to communicate with stakeholders and articulate ideas
  • Ability to review contractor and/or designer schedules submittals for conformance with contract requirements
  • Ability to update project schedules to reflect actual progress and compare against a baseline
  • Ability to forecast potential delays and propose “what-if” scenarios to keep projects on track
  • Ability to cost and/or resource load schedules
Benefits
  • We offer Medical, Dental, and Vision Plans
  • 401K, Paid Maternity Leave, Competitive PTO
  • Employee Assistance Program (EAP) and more 
Sponsorship and relocation are not available for this opportunity.

Ardmore Roderick is an Equal Employment Opportunity employer that is committed to diversity and inclusion in the workplace. All qualified applicants will receive consideration for employment without regard to race, color, religion, national origin, sex, sexual orientation, gender identity and expression, age, disability status, protected veteran status, or any other characteristic protected by local, state, or federal law. Ardmore Roderick participates in E-Verify.
 
We are committed to providing access, equal opportunity, and reasonable accommodation for individuals with disabilities. Please reach out to us if you require reasonable accommodation in responding to a job announcement, interviewing, or otherwise participating in the employee selection process.

Salary Range: $120,640-149,760, Ardmore Roderick is providing the compensation range that the company believes it might pay for and/or offer for this position, based on the successful applicant’s education, experience, knowledge, skills, and abilities in addition to internal equity and specific geographic location.
 
Share

Apply for this position

Required*
We've received your resume. Click here to update it.
Attach resume as .pdf, .doc, .docx, .odt, .txt, or .rtf (limit 5MB) or Paste resume

Paste your resume here or Attach resume file

To comply with government Equal Employment Opportunity and/or Affirmative Action reporting regulations, we are requesting (but NOT requiring) that you enter this personal data. This information will not be used in connection with any employment decisions, and will be used solely as permitted by state and federal law. Your voluntary cooperation would be appreciated. Learn more.

Invitation for Job Applicants to Self-Identify as a U.S. Veteran
  • A “disabled veteran” is one of the following:
    • a veteran of the U.S. military, ground, naval or air service who is entitled to compensation (or who but for the receipt of military retired pay would be entitled to compensation) under laws administered by the Secretary of Veterans Affairs; or
    • a person who was discharged or released from active duty because of a service-connected disability.
  • A “recently separated veteran” means any veteran during the three-year period beginning on the date of such veteran's discharge or release from active duty in the U.S. military, ground, naval, or air service.
  • An “active duty wartime or campaign badge veteran” means a veteran who served on active duty in the U.S. military, ground, naval or air service during a war, or in a campaign or expedition for which a campaign badge has been authorized under the laws administered by the Department of Defense.
  • An “Armed forces service medal veteran” means a veteran who, while serving on active duty in the U.S. military, ground, naval or air service, participated in a United States military operation for which an Armed Forces service medal was awarded pursuant to Executive Order 12985.
Veteran status



Voluntary Self-Identification of Disability
Voluntary Self-Identification of Disability Form CC-305
OMB Control Number 1250-0005
Expires 05/31/2026
Why are you being asked to complete this form?

We are a federal contractor or subcontractor. The law requires us to provide equal employment opportunity to qualified people with disabilities. We have a goal of having at least 7% of our workers as people with disabilities. The law says we must measure our progress towards this goal. To do this, we must ask applicants and employees if they have a disability or have ever had one. People can become disabled, so we need to ask this question at least every five years.

Completing this form is voluntary, and we hope that you will choose to do so. Your answer is confidential. No one who makes hiring decisions will see it. Your decision to complete the form and your answer will not harm you in any way. If you want to learn more about the law or this form, visit the U.S. Department of Labor’s Office of Federal Contract Compliance Programs (OFCCP) website at www.dol.gov/ofccp.

How do you know if you have a disability?

A disability is a condition that substantially limits one or more of your “major life activities.” If you have or have ever had such a condition, you are a person with a disability. Disabilities include, but are not limited to:

  • Alcohol or other substance use disorder (not currently using drugs illegally)
  • Autoimmune disorder, for example, lupus, fibromyalgia, rheumatoid arthritis, HIV/AIDS
  • Blind or low vision
  • Cancer (past or present)
  • Cardiovascular or heart disease
  • Celiac disease
  • Cerebral palsy
  • Deaf or serious difficulty hearing
  • Diabetes
  • Disfigurement, for example, disfigurement caused by burns, wounds, accidents, or congenital disorders
  • Epilepsy or other seizure disorder
  • Gastrointestinal disorders, for example, Crohn's Disease, irritable bowel syndrome
  • Intellectual or developmental disability
  • Mental health conditions, for example, depression, bipolar disorder, anxiety disorder, schizophrenia, PTSD
  • Missing limbs or partially missing limbs
  • Mobility impairment, benefiting from the use of a wheelchair, scooter, walker, leg brace(s) and/or other supports
  • Nervous system condition, for example, migraine headaches, Parkinson’s disease, multiple sclerosis (MS)
  • Neurodivergence, for example, attention-deficit/hyperactivity disorder (ADHD), autism spectrum disorder, dyslexia, dyspraxia, other learning disabilities
  • Partial or complete paralysis (any cause)
  • Pulmonary or respiratory conditions, for example, tuberculosis, asthma, emphysema
  • Short stature (dwarfism)
  • Traumatic brain injury
Please check one of the boxes below:

PUBLIC BURDEN STATEMENT: According to the Paperwork Reduction Act of 1995 no persons are required to respond to a collection of information unless such collection displays a valid OMB control number. This survey should take about 5 minutes to complete.

You must enter your name and date
Human Check*